New products

Information

Categories

Cream and green food truck with an open serving hatch and stainless steel interior, illustrative arrangement.

Hot water in a food truck: when should you consider DAFI?  - Assess the requirements, power supply and station before buying

In a food truck, DAFI should be considered as part of a specific handwashing or sink station. The choice depends on what you need at the tap, the available power, the water supply and the tap fittings. A compact appliance helps when planning the space, but its suitability for a vehicle must be assessed using the documentation for the exact model and the complete system.

Start by describing the daily work: washing hands, rinsing dishes, preparing food and cleaning after service. This guide helps you collect the information your installer needs and compare DAFI kits with other ways of providing hot water. It does not confirm compatibility with every food truck, pump or off-grid power supply.

1. A handwash basin and a kitchen sink have different jobs

In a small interior, it is easy to treat all water use as one requirement. Yet briefly washing your hands and rinsing a large pan call for different flow rates, temperatures and operating times. Write down the function of each station, even if they are only a short distance apart.

StationWhat should you describe before choosing?
Handwash basinFrequency of use, how the water is operated and the hygiene arrangements.
Dishwashing sinkThe size of utensils, rinsing time and whether the bowl is filled.
Food washingThe tasks involved, water quality and separation from other activities.

Include your busiest period and closing time. Cleaning at the end of the day may require more water than several quiet hours of serving customers. Also establish whether two taps will be used at once. A choice made for one handwash basin does not automatically cover the whole preparation area.

For a broader view of station planning, see our guide to DAFI in small catering businesses.

Illustrative stainless steel handwash basin in a food truck, with a soap dispenser and paper towels.Example handwashing-station arrangement. Generated illustration, not a photograph of an actual DAFI installation.

2. Prepare a simple food-truck requirements sheet

Before comparing appliances, describe an ordinary working day. Note your opening hours, the number of people using the station and the recurring tasks. Add an approximate duration of water use for each one. If the vehicle is already operating, observe service and cleaning rather than estimating requirements from the size of the sink.

For a new project, work through your planned menu. A business handing out prepared portions operates differently from one regularly rinsing utensils and larger containers. This description helps distinguish everyday requirements from occasional jobs that need a separate solution.

Add interior photographs, measurements of the free space, details of the existing power supply and a description of the water source. Highlight what changes between pitches. At one event, you may use the organiser’s connection; elsewhere, you may have a different energy source. Assess the solution under the conditions in which you actually intend to work.

Separate staff needs from the sequence of preparing orders. In an example sandwich business, the handwash basin is used briefly and repeatedly during service, while larger containers are washed after closing. A different menu may produce a different pattern. These scenarios help describe a project; they are not test results or ready-made appliance selections.

3. Check available power alongside the other equipment

Saying “we have 230 V” does not establish whether the supply can support the water heater. The connection’s permitted load, the vehicle’s installation and the appliances operating at the same time all matter. Include the coffee machine, cooking equipment, refrigeration, ventilation and other electrical loads.

A simple example shows the scale: a heater described as 3.7 kW and another appliance rated at 2 kW add up to approximately 5.7 kW when both operate at those powers simultaneously. This illustrates adding loads; it does not specify a connection or protective devices. A suitably qualified installation professional should assess the complete arrangement.

If you are considering a generator, battery or inverter, give their documentation to the person assessing the project. The specification of one component does not establish that the whole system will work. Before ordering, you need an answer covering the exact DAFI model, the power-supply conditions and the connection method. Our guide to preparing an installation before buying provides a useful list of information.

Before an event, ask the organiser for details of the connection provided and the rules for using it. Pass the answer to your installer together with the equipment list. Keep a clear record with the vehicle documents of the confirmed conditions under which the station may be operated. This helps someone covering for the owner and makes future pitches easier to plan.

4. Assess the tank, pump and water entering the appliance

A tank supply requires an assessment of the whole water circuit. Simply adding a pump does not establish the heater’s operating conditions. Give the installer its model reference, performance information, control method and a description of what happens when the tap opens. Include any changes as the water level in the tank falls.

DAFI documentation describes an appliance intended to heat mains-supplied water. With a different supply arrangement, compatibility must be confirmed for the model and the water conditions concerned. The heater does not replace providing water of suitable quality or maintaining the tank, pipework and tap fittings as required.

Plan clean-water replenishment and wastewater collection for the whole day. Using the tap carefully can help with organisation, but the quantity of water must meet the tasks involved. Mark access to the components included in the project on your layout drawing. Servicing should not require dismantling much of the preparation area.

5. Consider temperature together with the flow you need

An instantaneous water heater heats water as it is drawn. For a given model, the result depends on factors including the incoming water temperature and the flow rate. “I need hot water” is therefore too general a brief for comparing offers.

Tell the installer what you do at the tap and what flow feels practical for that task. Allow for colder incoming water at autumn events if you also work then. Ask for an assessment under defined conditions and a way to check the result at the completed station.

A short handwash and prolonged dish rinsing may lead to different choices even when both use the same cold-water source. Do not choose power solely from the size of the food truck. Our DAFI power-selection guide explains how requirements, power and performance relate to one another.

6. Compare what an under-basin or under-sink kit includes

In a small cupboard, the heater’s dimensions are only part of the picture. The trap, connections and other station equipment also need room. Show the installer the positions of shelves, bins and doors. When assessing a vehicle installation, include the mounting method and transport conditions.

The following product block presents two DAFI IPX4 kits: 3.7 kW and 4.5 kW at 230 V, with a connection fitting and shut-off valve. They are shown to compare the equipment supplied. Products in this article are not a ready-made selection for every vehicle or confirmation that a station meets hygiene requirements.

When ordering, compare kits with a clearly described contents list. A heating element on its own, an accessory and a complete appliance are different purchases. Establish what the offer includes, which components the project requires and who is responsible for matching them. List plumbing and electrical work separately.

7. Match the tap fittings to the station’s operation

Choosing the heater and choosing the tap should be part of one project. Some DAFI kits include their own tap, spout and aerator. The second product block shows IPX5 examples rated at 3.7 kW and 4.5 kW at 230 V. This comparison helps identify the equipment, but how the water is operated must suit the tap’s purpose.

At a professional handwashing station, hygiene requirements may affect the choice of fittings. An ordinary hand-operated control does not establish that the washbasin complies. Similarly, adding any sensor or valve to a heater is not a validated solution. Check the permitted accessories and how the complete arrangement operates.

For a business operating in France, consider the official information on food-business hygiene and the requirements relevant to the mobile outlet and its activities. Agree the arrangements for washing hands, dishes and food before buying equipment.

8. Compare an instantaneous heater with a storage system

Base the choice on the conditions at your pitch and the pattern of water use. An instantaneous appliance heats during draw-off, so it needs a suitable power supply at that time. A storage system holds heated water; its available reserve and the time needed to replenish it also need assessment.

Project questionWhat should you compare?
What power is available during work?The water-heating load alongside the other equipment.
What is the pattern of water use?Short uses, long rinses, simultaneous demand and breaks.
How much space can the system occupy?All components, service access and the installation layout.
How long must the station operate?The full working day, water replenishment and any waiting.

Consider this example for discussion: the vehicle uses different connections at successive events. Before selection, the installer assesses every intended supply arrangement and an ordinary working day. If the conditions for using DAFI remain unconfirmed, clarify them or choose a solution documented for that system. Compare the result at the tap and the full installation requirements.

Also ask how the completed station will be handed over and checked. This should relate to an ordinary task described in your enquiry, carried out under the agreed working conditions. Record what will be checked, who will explain operation and which documents you will receive. The broad expectation “it needs to be convenient” then becomes a scope of work both parties can understand.

9. Include cleaning, shutdowns and colder months

The hot-water provision must also suit the last jobs after closing. Agree how long the power supply remains available and when preparation for transport begins. Whoever cleans the station should know the operating rules and have contact details for the installer or service provider.

Base maintenance and restarting on the model’s instructions. Include water-supply interruptions and the vehicle’s storage conditions. Do not switch on the heater if it may contain frozen water. Follow the documentation for air purging and servicing, involving the appropriate professional where required.

If the food truck is kept in an unheated location in winter, address that situation during design. Our guide to preparing DAFI for a seasonal shutdown can help you put together the questions to ask.

10. Calculate costs and prepare the information before ordering

Add equipment, installation work and any changes to the cabinetry to the appliance price. Establish the servicing arrangements and how the station will operate during maintenance or a breakdown. Compare two offers against the same requirements and power-supply conditions.

Calculate energy separately from the power required at a particular moment. If an appliance operated for a total of 10 minutes at 4.5 kW, it would use 0.75 kWh in this example. Multiply the result by your own energy rate to obtain the cost. This is not a measurement from a particular food truck: the actual result depends on operating time and use, while an off-grid supply also involves the characteristics of the whole system.

Before asking for help choosing equipment, prepare:

  • The purpose of each tap and the duration and frequency of water use.
  • The required flow, temperature and simultaneous use of stations.
  • Details of the available power supply and other electrical loads.
  • A description of the water source, tank, pump and tap fittings.
  • The exact appliance reference and its instructions.
  • Photographs, dimensions and transport and storage conditions.
  • The scope of work, handover checks and the installer’s contact details.

DAFI is worth comparing when the design of the specific station allows its application to be assessed. Start with this list and confirmation of the model’s conditions. Send us the kit references and your requirements if you would like help comparing their contents; have the complete vehicle installation assessed by the professional responsible for it.